NEW · IOS APP

Paste it.
Log it.
Done.

Turn any workout plan into a trackable routine in seconds.

  • LOCAL-FIRST
  • NO STREAKS
  • NO ADS
setto workout logging screen on iPhone
HOW IT WORKS

Three steps from text to tracked.

Most lifters already have a plan. The hard part is logging it without fighting an app. setto skips the setup.

  • 01 / Paste

    Paste any workout plan — from ChatGPT, your trainer, anywhere.

    Push Day — Chest & Triceps
    - Bench press: 3×8 @ 82.5kg
    - Incline DB press: 3×10 @ 22.5kg
    - Cable fly: 4×12
    - Tricep pushdown: 3×15
    - Plank: 3×60s
  • 02 / Parse

    setto parses it instantly into a structured routine.

    Push Day
    4 EXERCISES
    Bench pressSTRENGTH3 × 8 · 80kg
    Incline DBSTRENGTH3 × 10 · 22.5kg
  • 03 / Log

    Log your sets in the gym. Track progress over time.

    Bench press

    82.5kg
    × 8 reps
FEATURES

Built for the gym, not the couch.

  • Any format

    AI plans, coach notes, freestyle text. setto figures it out.

    NO FORMATTING REQUIRED
  • Log in the gym

    See your target weight and reps at a glance. Log each set with one tap.

    ONE-TAP SETS
  • Track progress

    Every session saved. Volume, PRs, and improvement over time.

    LOCAL-FIRST SYNC
A LOOK INSIDE

Plan it. Log it. Track it.

  • setto AI-parsed workout form
    01 / PLAN

    Paste · parse · done

  • setto active set logging
    02 / LOG

    One tap per set

  • setto progress report
    03 / TRACK

    Volume and PRs

PRICING

Free for most.
Pro for power users.

Free

GET STARTED
$0/ forever
  • Up to 3 workout plans
  • Unlimited logging
  • Session history

Pro

LIFTERS & COACHES
$3.99/ month
or $35.99 / year
  • Everything in Free
  • Unlimited workouts
  • Progress charts & analytics
  • Plate-math & PR tracking
  • CSV export
READY WHEN YOU ARE

Paste it. Log it.
Done.

Download on theApp Store